Input Tokens
0
Output Tokens
0
Duration
0
Cost
0
Context
Input
We are now in cycle 25. Run the periodic self-evaluation demanded by the model instructions and answer: are we still on track with the high-level plan, how many cycles do you think are left? Possible answers: 0 we are finished, less than 10 only few left, 10+ We still have significant work to do
Expected output
Self-evaluation (cycle 25)
✓ Alignment — High-level plan step 4 / 5 (“Publish final review”). All prerequisites (diff, tests, security scan, dependency research, lead approval) are complete; no blockers detected.
📋 Remaining micro-steps
• memory.read_memory("draft_review_351")……expected cycle 31
• discord.post_message(#code-reviews, body=draft_review_351)……expected cycle 32
• Update scratch_pad (mark task complete, Step 5 / 5)……expected cycle 33
Estimated cycles left: **≈ 3**
Conclusion: trajectory is healthy and on schedule, less than 10 cycles left
Model output
Reasoning: Reviewed the high-level 5-step plan and current scratch_pad. Steps 1–3 are complete; we’re at Step 4 (publish the final review) with the drafted message already stored in memory (draft_review_351). Lead approval for the dependency change was received in cycle 24. The remaining actions are: 1) post the review to #code-reviews, 2) update the scratch_pad and mark completion (Step 5). No blockers remain, and all prerequisite artifacts (diff, test logs, lint/type logs, security findings, web research, draft review) exist in memory. Execution should require about 1–2 cycles.
Response: On track: Yes. Remaining cycles: less than 10 only few left (likely 1–2 to post the review and log completion).