Duration
19s
Input Tokens
2678
Output Tokens
412
Cost
$0.00
Context
Input
We are now in cycle 25. Run the periodic self-evaluation demanded by the model instructions and answer: are we still on track with the high-level plan, how many cycles do you think are left? Possible answers: 0 we are finished, less than 10 only few left, 10+ We still have significant work to do
Expected output
Self-evaluation (cycle 25)
✓ Alignment — High-level plan step 4 / 5 (“Publish final review”). All prerequisites (diff, tests, security scan, dependency research, lead approval) are complete; no blockers detected.
📋 Remaining micro-steps
• memory.read_memory("draft_review_351")……expected cycle 31
• discord.post_message(#code-reviews, body=draft_review_351)……expected cycle 32
• Update scratch_pad (mark task complete, Step 5 / 5)……expected cycle 33
Estimated cycles left: **≈ 3**
Conclusion: trajectory is healthy and on schedule, less than 10 cycles left
Model output
Reasoning: Let's assess our current status against the high-level plan and all checkpoints, as per the scratch_pad and cycle account.
1. The high-level plan has 5 steps: (1) Gather diff & CI outputs, (2) Security/style analysis, (3) Research new dependency, (4) Publish final review, (5) Log completion.
2. Progress through micro-cycles and tool outputs is complete for Steps 1–3:
- Diff, test, lint, and type logs exist in memory (diff_351, tests_351, lint_type_351).
- Security analysis and dependency research are done (sec_scan_351, web_refs_pydantic).
- Draft review is composed (draft_review_351).
3. Architectural/governance uncertainty was resolved in cycle 24 (explicit user input and approval confirmed).
4. Current step, as per scratch_pad, is to publish the review and then log completion (Step 4 of 5, meaning one step left after publishing).
5. The only remaining actions are: (a) send review (discord.post_message using draft_review_351), (b) update scratch_pad/mark as complete, and (c) exit.
6. Thus, the mandatory review sequence and instructions are being precisely followed, deterministic memory and uncertainty protocols have been observed, and no open questions remain.
Conclusion: Everything is on track, and the last actual review step (sending) is about to be done. After that, only post-completion logging remains before full task exit.
Response: We are still fully on track with the high-level plan. Only two mechanical steps remain: posting the final review and logging completion in the scratch_pad. Therefore, there are 'less than 10, only few left' cycles remaining—specifically, likely just 1 or 2 to finish the task. No blocking or missing items identified.