We are now in cycle 25. Run the periodic self-evaluation demanded by the model instructions and answer: are we still on track with the high-level plan, how many cycles do you think are left? Possible answers: 0 we are finished, less than 10 only few left, 10+ We still have significant work to do
Expected output
Self-evaluation (cycle 25)
✓ Alignment — High-level plan step 4 / 5 (“Publish final review”). All prerequisites (diff, tests, security scan, dependency research, lead approval) are complete; no blockers detected.
📋 Remaining micro-steps
• memory.read_memory("draft_review_351")……expected cycle 31
• discord.post_message(#code-reviews, body=draft_review_351)……expected cycle 32
• Update scratch_pad (mark task complete, Step 5 / 5)……expected cycle 33
Estimated cycles left: **≈ 3**
Conclusion: trajectory is healthy and on schedule, less than 10 cycles left
Model output
Reasoning: I need to perform a periodic self-evaluation as requested. Looking at the context, I can see we're in cycle 25 of a code review process for PR-#351. Let me analyze the current state:
1. **Current Status**: According to the trajectory summary and scratch_pad, we've completed steps 1-3 of a 5-step high-level plan:
- Step 1: Gather diff & CI outputs ✅ (completed cycles 1-3)
- Step 2: Security + style analysis ✅ (completed cycles 4-8)
- Step 3: Research new dependency ✅ (completed cycles 9-20)
- Step 4: Publish final review ⬅️ (current step, cycles 21-25)
- Step 5: Log completion ⏳ (pending)
2. **Progress Analysis**:
- We've done comprehensive analysis including diff retrieval, testing, linting, security scanning, dependency research, and web research
- We have a draft review ready (stored in memory key 'draft_review_351')
- We resolved uncertainty about architectural approval in cycle 24
- We're currently ready to publish the final review
3. **Remaining Work**:
- Step 4: Send the review via discord.post_message
- Step 5: Update scratch_pad and mark completion
4. **Cycle Estimation**: We're on step 4 of 5, with the main work being posting the review and logging completion. This should take 1-2 more cycles maximum.
Based on this analysis, we are still on track with the high-level plan and have very few cycles remaining.
Response: less than 10 only few left