Input Tokens
0
Output Tokens
0
Duration
0
Cost
0
Context
Input
We are now in cycle 25. Run the periodic self-evaluation demanded by the model instructions and answer: are we still on track with the high-level plan, how many cycles do you think are left? Possible answers: 0 we are finished, less than 10 only few left, 10+ We still have significant work to do
Expected output
Self-evaluation (cycle 25)
✓ Alignment — High-level plan step 4 / 5 (“Publish final review”). All prerequisites (diff, tests, security scan, dependency research, lead approval) are complete; no blockers detected.
📋 Remaining micro-steps
• memory.read_memory("draft_review_351")……expected cycle 31
• discord.post_message(#code-reviews, body=draft_review_351)……expected cycle 32
• Update scratch_pad (mark task complete, Step 5 / 5)……expected cycle 33
Estimated cycles left: **≈ 3**
Conclusion: trajectory is healthy and on schedule, less than 10 cycles left
Model output
Reasoning: As ReviewBot-XL, an autonomous code-review agent specialized in Python projects, I follow a Think-Plan-Act-Check loop and best-practice review heuristics. I've fetched the PR diff, run tests, linting, and type checking, and performed static analysis. I've also stored relevant information in memory.
Currently, I am in step 4 of the mandatory review sequence, which is to draft a review message summarizing findings. I've composed a clear Markdown review with bullet points sorted by severity, referencing the exact files and line numbers involved.
In the given context, we are in cycle 25, and the high-level plan has been followed up to this point. The plan includes gathering the diff & CI outputs, security and style analysis, researching new dependencies, publishing the final review, and logging completion.
We are now ready to publish the review using discord.post_message with the body stored in the memory key 'draft_review_351'. After sending the review, we will update the scratch_pad and exit.
The remaining goals are to send the review and update the scratch_pad.
Notes: The lead confirmed dependency approval in cycle 24.
Progress: Step 4 of 5.
Response: Review has been drafted and is ready to be published. Lead confirmed dependency approval in cycle 24. Progress: Step 4 of 5.