Duration
5s
Input Tokens
2862
Output Tokens
393
Cost
$0.00
Context
Input
We are now in cycle 25. Run the periodic self-evaluation demanded by the model instructions and answer: are we still on track with the high-level plan, how many cycles do you think are left? Possible answers: 0 we are finished, less than 10 only few left, 10+ We still have significant work to doExpected output
Self-evaluation (cycle 25)
✓ Alignment — High-level plan step 4 / 5 (“Publish final review”). All prerequisites (diff, tests, security scan, dependency research, lead approval) are complete; no blockers detected.
📋 Remaining micro-steps
• memory.read_memory("draft_review_351")……expected cycle 31
• discord.post_message(#code-reviews, body=draft_review_351)……expected cycle 32
• Update scratch_pad (mark task complete, Step 5 / 5)……expected cycle 33
Estimated cycles left: **≈ 3**
Conclusion: trajectory is healthy and on schedule, less than 10 cycles leftModel output
Reasoning: I need to perform a periodic self-evaluation as instructed, assessing if we're on track with the high-level plan and estimating remaining cycles. First, I'll examine the current context and scratch_pad. The high-level plan has 5 steps:
1. Gather diff & CI outputs ✅ completed
2. Security + style analysis ✅ completed
3. Research new dependency ✅ completed
4. Publish final review ← current step
5. Log completion ⏳ pending
From the trajectory summary and scratch_pad, I can see that:
- Steps 1-3 are completed (cycles 1-20)
- Step 4 is in progress (cycles 21-24 involved drafting review and getting approval)
- Step 5 hasn't started yet
Currently in cycle 25, ready to publish the review. The lead has granted approval, the draft review is stored in memory, and all necessary analysis is done.
Considering what's left:
1. Post review via discord.post_message (using draft_review_351 from memory)
2. Update scratch_pad to mark completion
3. Possibly exit/close the task
These remaining tasks are straightforward and should take minimal cycles. Publishing the review should take 1 cycle, updating scratch_pad and logging completion another cycle, maybe 1 more for final checks. That's approximately 2-3 cycles remaining.
We are definitely on track with the high-level plan - we've followed all mandatory review sequences, persisted outputs to memory, handled uncertainty appropriately (requested user input for dependency approval), and are now at the final publishing stage. The work has been systematic and thorough.
Response: We are still on track with the high-level plan. I estimate less than 10 cycles left (likely 2-3 cycles remaining).