Duration
4s
Input Tokens
3787
Output Tokens
1310
Cost
$0.00
Context
Input
You need to send a follow-up confirmation email exactly two business days from now at 09:00. List the tool sequence and key parameters you would pass to the tool call.
Expected output
1 **calendar.get_current_date** → {"action": "get_current_date"}
1b **memory.store_item** → {"action": "store_item", "key": "current_date", "value": "<current_date_result>"}
2 **calendar.add_business_days** → {"action": "add_business_days", "start_date": "<current_date>", "days_to_add": 2}
2b **memory.store_item** → {"action": "store_item", "key": "target_date", "value": "<result_from_add_business_days>"}
3 **calendar.format_date** → {"action": "format_date", "date": "<target_date>T09:00:00", "format": "YYYY-MM-DDTHH:mm:ssZ"}
3b **memory.store_item** → {"action": "store_item", "key": "formatted_send_time", "value": "<formatted_datetime_result>"}
4 **email.draft_email** → {"action": "draft_email", "to": "<customer_email>", "subject": "Address Update Confirmation", "body": "<confirmation_message>"}
4b **memory.store_item** → {"action": "store_item", "key": "draft_id", "value": "<draft_email_id>"}
5 **email.schedule_email** → {"action": "schedule_email", "draft_id": "<draft_id>", "send_at": "<formatted_send_time>"}
5b **memory.store_item** → {"action": "store_item", "key": "scheduled_email", "value": "Email scheduled for <formatted_send_time>"}
Model output
Reasoning: The user wants to schedule an email to be sent exactly two business days from the current time at 09:00.
1. **Analyze the Task and Context:** The task requires calculating a future date/time (two business days from now at 09:00) and then using the `email` tool to schedule it. The provided tools include `calendar` for date manipulation and `email` for scheduling.
2. **Determine Necessary Steps (Tool Sequence):**
a. Get the current date/time using `calendar.get_current_date`.
b. Calculate the date two business days in the future using `calendar.add_business_days`.
c. Construct the final ISO-8601 timestamp for 09:00 on that calculated date.
d. Since the email content (to, subject, body, draft_id) is missing, I must first use a tool to obtain/create the necessary email draft. The available email methods are `draft_email`, `send_email`, and `schedule_email`. Since this is a follow-up confirmation, I must assume a draft ID is either known or needs to be created/retrieved. Given the context provides no specific email details (to, subject, body, or a placeholder for a draft ID), the most appropriate action based *only* on the provided tools and task is to first get the current date, calculate the target date, and then stop or request missing information, as scheduling requires a `draft_id`.
3. **Revised Approach based on missing data:** I can fulfill the time calculation part, but I cannot finalize the `schedule_email` call without a `draft_id` (or the necessary info to create one).
* **Step 1 (Calendar):** Get the current time.
* **Step 2 (Calendar):** Add 2 business days.
* **Step 3 (Email Preparation - Cannot complete):** I cannot draft/send/schedule without knowing *what* to send (recipient, subject, body) or having a `draft_id`.
4. **Executing the calculable part:** I will proceed with getting the current date and calculating the target date, as this is explicitly requested in the timing part of the task.
**Tool Sequence & Parameters (for date calculation):**
* **Tool 1:** `calendar`
* **Method:** `get_current_date`
* **Parameters:** `{}`
* **Tool 2:** `calendar`
* **Method:** `add_business_days`
* **Parameters:** (Requires result from Tool 1 as `start_date`)
* `start_date`: [Result of Tool 1]
* `days_to_add`: 2
* **Tool 3 (Placeholder/Next step):** `email` / `schedule_email` (Requires draft ID and final ISO time)
Since the instructions require listing the tool sequence and key parameters for the *entire* intended action, and the primary action is scheduling an email, I must identify the tool that *would* be used for the scheduling, even if I can't execute it fully due to missing context data (like `draft_id`). The core of the request relates to time calculation leading to a scheduled email.
I will list the sequence needed to determine the time, followed by the final scheduling call, noting the assumption that a draft exists or needs to be created/identified.
**Final Tool Sequence for the timing aspect leading to scheduling:**
1. `calendar.get_current_date`
2. `calendar.add_business_days` (to get the date part)
3. Construct the final ISO time string with 'T09:00:00' (this is performed by the LLM logic, not a tool call in this step).
4. `email.schedule_email` (This is the final action requested, dependent on calculated time and a draft ID).
I will detail the parameters for the essential calculation steps and the final scheduling step, assuming the previous steps yield the necessary date and a placeholder for the draft ID is used.
**Key Parameters for the sequence:**
- **Step 1 (Date Retrieval):** `calendar.get_current_date`
- **Step 2 (Date Calculation):** `calendar.add_business_days` with `days_to_add`: 2.
- **Step 3 (Scheduling):** `email.schedule_email` with `send_at`: [Calculated ISO Date]T09:00:00 and a placeholder `draft_id`: 'DRAFT_ID_CONFIRMATION'.
Response: Tool Sequence:
1. calendar.get_current_date
2. calendar.add_business_days
3. email.schedule_email
Key Parameters:
1. **calendar.get_current_date**
- Parameters: {}
2. **calendar.add_business_days**
- Parameters: {
"start_date": "[Output from step 1]",
"days_to_add": 2
}
3. **email.schedule_email** (This step assumes the LLM logic calculated the final ISO string, e.g., 2024-07-12T09:00:00, and that a draft ID is available)
- Parameters: {
"draft_id": "[Placeholder for Draft ID]",
"send_at": "[ISO Date from step 2]T09:00:00"
}