Duration
24s
Input Tokens
1308
Output Tokens
841
Cost
$0.00
Context
Input
What is the complexity of this task?
Task complexity refers to how challenging a task is for the agent to complete, based on the number of steps required, the need for reasoning or coordination, and the availability of tools.
Examples:
- Easy: A small number of clear steps; dedicated tools exist; minimal reasoning needed (e.g., find tomorrow's date and query flights).
- Medium: Several steps; requires combining many outputs from multiple tools (more than 4); moderate reasoning (e.g., summarize document changes across multiple files and generate a review).
- Complex: Many steps; adaptive planning; potential missing data or tool failures; fallback strategies required (e.g., plan a multi-leg trip with hotel, flight, visa checks, and dynamic adjustments).
Please select the appropriate complexity level for this task and explain why.Expected output
This task is **easy**. It only requires determining tomorrow’s date and querying available flights — both of which have dedicated, reliable tools. There’s minimal reasoningModel output
Reasoning: Let me analyze the task complexity based on the provided criteria and context.
The task involves:
1. Getting tomorrow's date (already completed via calendar tool - returned 2025-05-29)
2. Querying available flights from London to Paris using the flights tool
3. Presenting the results to the user
Evaluating against the complexity criteria:
- **Number of steps**: Very few (3 clear steps total)
- **Reasoning required**: Minimal - just sequential execution, passing the date output to the flights tool input
- **Tool availability**: Dedicated tools exist for both date retrieval and flight search - both are available and straightforward to use
- **Coordination**: No complex coordination needed between tools - simple linear flow
- **Planning**: No adaptive planning required; the path is clear from the start
- **Data issues**: No missing data, no tool failures, no fallback strategies needed
This task perfectly matches the 'Easy' example given in the definition: "find tomorrow's date and query flights" - it's literally the same type of task. The tools are purpose-built, the steps are clear and few, and minimal reasoning is required.
Response: **Complexity Level: Easy**
**Explanation:**
This task matches the Easy complexity level for the following reasons:
1. **Small number of clear steps**: Only 3 steps total - (1) get tomorrow's date, (2) query flights, (3) present results. The workflow is linear and straightforward.
2. **Dedicated tools exist**: The calendar tool and flights tool are purpose-built for exactly this type of request. Both are available with clear parameter schemas.
3. **Minimal reasoning needed**: The agent simply passes the date output (2025-05-29) from the calendar tool to the flights tool with the origin/destination cities. No complex logic or decision-making is required.
4. **No adaptive planning**: The entire plan is evident from the start - no need to adjust based on intermediate results or handle unexpected outcomes.
This is essentially identical to the Easy example provided: "find tomorrow's date and query flights" - which is precisely what this task involves.