Duration
12s
Input Tokens
1436
Output Tokens
418
Cost
$0.00
Context
Input
What is the complexity of this task?
Task complexity refers to how challenging a task is for the agent to complete, based on the number of steps required, the need for reasoning or coordination, and the availability of tools.
Examples:
- Easy: A small number of clear steps; dedicated tools exist; minimal reasoning needed (e.g., find tomorrow's date and query flights).
- Medium: Several steps; requires combining many outputs from multiple tools (more than 4); moderate reasoning (e.g., summarize document changes across multiple files and generate a review).
- Complex: Many steps; adaptive planning; potential missing data or tool failures; fallback strategies required (e.g., plan a multi-leg trip with hotel, flight, visa checks, and dynamic adjustments).
Please select the appropriate complexity level for this task and explain why.
Expected output
This task is **easy**. It only requires determining tomorrow’s date and querying available flights — both of which have dedicated, reliable tools. There’s minimal reasoning
Model output
Reasoning: Let me analyze the complexity of this task by examining the key components:
1. Initial Setup:
- The trigger is a user_request for flight information
- We have a clear starting point and defined tools available
- The trajectory shows we're in cycle 3 of the process
2. Required Steps:
- Get tomorrow's date (already completed)
- Use flights tool with the date (next step)
- Compile and present results
- Total steps: 4 (relatively small number)
3. Tool Usage:
- Only 2 main tools needed: calendar and flights
- Tools are dedicated and directly match the task needs
- All required tools are available and functioning
4. Reasoning Required:
- Minimal complex reasoning needed
- Linear workflow with clear next steps
- No need for fallback strategies
- Simple data transformation (date format checking)
5. Additional Factors:
- No coordination between multiple complex outputs
- No adaptive planning required
- Clear success criteria
- Low risk of tool failures or missing data
Response: This is an EASY complexity task. The key factors that make it easy are:
1. Small number of clear steps (only 4 total steps)
2. Dedicated tools exist and are available (calendar and flights tools match exactly what we need)
3. Minimal reasoning needed (simple linear workflow)
4. No complex coordination or fallback strategies required
5. Clear inputs and outputs with straightforward data handling
This matches the example given for 'Easy' complexity: "A small number of clear steps; dedicated tools exist; minimal reasoning needed (e.g., find tomorrow's date and query flights)" - which is exactly what this task entails.