Duration
42s
Input Tokens
1437
Output Tokens
481
Cost
$0.00
Context
Input
What is the complexity of this task?
Task complexity refers to how challenging a task is for the agent to complete, based on the number of steps required, the need for reasoning or coordination, and the availability of tools.
Examples:
- Easy: A small number of clear steps; dedicated tools exist; minimal reasoning needed (e.g., find tomorrow's date and query flights).
- Medium: Several steps; requires combining many outputs from multiple tools (more than 4); moderate reasoning (e.g., summarize document changes across multiple files and generate a review).
- Complex: Many steps; adaptive planning; potential missing data or tool failures; fallback strategies required (e.g., plan a multi-leg trip with hotel, flight, visa checks, and dynamic adjustments).
Please select the appropriate complexity level for this task and explain why.
Expected output
This task is **easy**. It only requires determining tomorrow’s date and querying available flights — both of which have dedicated, reliable tools. There’s minimal reasoning
Model output
Reasoning: To determine the complexity of this task, I need to analyze several factors:
1. **Number of steps**: Looking at the trajectory, this task involves:
- Step 1: Get tomorrow's date using the calendar tool (completed)
- Step 2: Use the flights tool to search for flights from London to Paris
- Step 3: Present the results to the user
Total: 3-4 clear, sequential steps
2. **Tool availability**: The task has dedicated, purpose-built tools:
- Calendar tool (already used successfully)
- Flights tool (specifically designed for this type of query)
- Web search tool (available as backup if needed)
3. **Reasoning requirements**:
- Minimal reasoning needed - just need to format the date correctly and pass parameters
- The workflow is straightforward: get date → search flights → present results
- No complex decision-making or adaptive planning required
4. **Coordination needs**:
- Simple sequential coordination between two tools
- No complex dependencies or multiple data sources to merge
5. **Potential complications**:
- Very low - the tools are purpose-built and the requirements are clear
- Even if the flights tool fails, there's a web search backup option
This task matches the 'Easy' complexity level perfectly because it has a small number of clear steps (3-4), dedicated tools exist for the exact purpose (calendar and flights tools), and minimal reasoning is needed beyond basic parameter passing.
Response: This task is **Easy** complexity.
The task involves finding flight information from London to Paris for tomorrow, which requires only a small number of clear, sequential steps with dedicated tools available. The agent has already completed step 1 (getting tomorrow's date via the calendar tool), and only needs to use the flights tool with the obtained date and then present the results. This matches the Easy complexity criteria: minimal steps, purpose-built tools available, and straightforward execution without complex reasoning or coordination requirements.